Sources of Risk

Sources of Risk
By Ray W. Frohnhoefer

Growing up, I knew life was a risky business. In the early cartoons and comedies I watched, safes and pianos fell on hapless victims. Perhaps the most memorable though were the Road Runner cartoons where disaster befell Wile E. (Ethelbert) Coyote at every turn. Road Runner avoided precariously balanced boulders which always fell on Coyote. Then there were the numerous Acme product failures where rocket skates and simple bombs malfunctioned at the expense of the Coyote.

Our projects face many sources of risk too. Here are just a few:

Risks External to Projects

  • Legislative
  • Legal (patents and lawsuits)
  • Changes in technology (does your software project need to support Windows Vista?)
  • Natural hazards and conditions (have you seen the latest volcano news?)
  • Environmental (does a protected or rare species lie in your freeway path?)
  • Corporate policy and procedural changes

Risks Internal to Projects

  • Client driven scope changes
  • Out of balance cost, schedule, or quality
  • Unplanned for events and change
  • Project selection (did we pick the best project to work on now?)
  • Resource issues
  • Design (did we specify something we can’t build?)

And on top of it all, there are those unknown unknowns — the things we never would have thought to identify and plan for. With all these sources, how can we make sure we capture all the possibilities? There are a few simple things to think through and do at the start of any project:

  1. Who are our stakeholders, including supporters and detractors? What is their influence?
  2. Are there steps we should add to the project to ensure success? For example, a feasibility study or expert review.
  3. Do we have a plan in place to manage scope and change effectively?
  4. Brainstorm the risk possibilities to determine main internal and external risk sources.
  5. Consult experts and those who monitor external conditions to determine risk (what’s the likelihood of rain during our construction project? will a new operating system derail our software project?).
  6. Examine risk sensibly (a process commensurate with the levels and impacts of risk) and statistically (did you know air travel is safer than travel by car?).

Ray W. Frohnhoefer, MBA, PMP is the Director of the Project Support Office at EDmin as well as a consultant, speaker, writer, educator, and mentor on Project Management. Ray is also the Component Mentor for PMI Region 7 (Southwest North America), a Past President of PMI, San Diego Chapter, Inc., and an adjunct faculty member at three San Diego universities. You can find out more about his professional roles at http://www.edmin.com/company/index.cfm?function=showBioDetail&id=80 and through his blog, Tales from the Project Notebook, at http://projectnotebook.blogspot.com.

PMHut Team

PMHut Team

PMHut.com is a website dedicated to providing PM articles, detailed project management software reviews, and the latest news for the most popular web-based collaboration tools.

1 Response

  1. June 29, 2010

    […] have already covered the sources of risk, and now we’ll start looking at a simple methodology which can be employed to evaluate these […]

Leave a Reply